Mast, Booms & rigging engineering
31 January 2014
Mast, Booms & rigging engineering
Engineering and working drawings for the masts en booms of a ketch including cutting parts.
3D wire frame to extract all wire lengths, so they can be made in advance.
Masts will be placed on the yacht in march 2014.